Back to the newsroom

Germany
23
November 2023

E-nacelle prototype sets new standards with a stringent identical parts concept

About one year after the installation of the first E-nacelle with new converter technology ENERCON is preparing a derivative of this E-nacelle for installation in the first customer project. Whereas the prototype is intended for an E-160 EP5, this nacelle type is also for installation in the E-175 EP5.

On Monday, the first model of ENERCON’s new E-nacelle was transported out of the prototype building and into the plant test station at the Aurich site in Germany. Here, the E-nacelle will be undergoing intensive measurement in the setting of the factory acceptance test (FAT) shortly before shipment to the prototype construction site. The nacelle can then be delivered to the construction site plug-and-play ready, where it can be installed at once. This renders time-consuming and costly functional checks on site obsolete.

Moreover, the new nacelle can dispense with a steel frame thanks to its innovative self-supporting design. The pre-assembled side sections reduce the process time in production significantly.

In the long term, all ENERCON wind energy converters will benefit from the advantages of the new E-nacelle thanks to the stringent identical parts concept. In addition to the E-160 EP5, the advanced E-nacelle will also be deployed in the E-138 EP3 and the new top model – the E-175 EP5 – which is currently taking centre stage at ENERCON’s Husum Wind trade fair stand. In this way, the reduced processing times provide for cost optimisations across the ENERCON product portfolio.

Come to Husum to learn more about our products and services – particularly our new top model, the ENERCON E-175 EP5 E2 with a rotor diameter of 175 metres and a nominal power of 6.X MW. ENERCON will be present on site at this year’s leading trade fair for onshore wind energy from 12 to 15 September (Hall 2, Stand B09).

Apart from the E-175 EP5 E2 6.X MW we are presenting more product innovations and services. In addition, our  recruiters will be available at the trade fair stand as points of contact for questions about joining and building a career at ENERCON.

Your contact for further questions:

Felix Rehwald

Head of Corporate Communications / Spokesperson

Dreekamp 5
26605 Aurich
Germany

View CV

Contact

This is ENERCON

As a pioneer of wind energy technology and a committed supporter of the energy transition, we have specialised in developing, producing, selling and servicing onshore wind turbines. Pursuing our mission of ‘Energy for the world’, we have been championing sustainable energy generation from onshore wind since 1984. Thanks to our innovative wind turbine technology, high quality standards and many years of experience, we are one of the industry’s leading manufacturers anywhere in the world.

Latest news and topics

News
Luxembourg
25
September 2024

ENERCON turbines with a total capacity of 104 MW for Luxembourg

ENERCON and long-standing customer Soler signed contract during WindEnergy Hamburg

Learn more
40 years of ENERCON
Global
28
May 2024

Ingenious product development as the basis for the company’s success

ENERCON achieved the technological breakthrough in the 1990s with the legendary E-40/500 kW. The gearless drive concept introduced for the first time with this wind turbine type still characterises ENERCON wind energy converters to this day. It also forms the basis for the new top-of-the-range model E-175 EP5 that ENERCON is currently rolling out in series production.

View details
Press release
Turkey
21
March 2024

ENERCON and Enerjisa Üretim sign turbine delivery agreement for the second phase of the YEKA 2 Project

Following the successful fulfilment of the 750 MW turbine delivery agreements in the first phase, the companies have taken another step towards completing the 1,000 MW project by signing a delivery agreement for the remaining 250 MW capacity.

View details
Press release
Global
18
March 2024

ENERCON announces E-175 EP5 version with increased nominal power and hub height

As of 2026, top model will be available with 7.0 MW and tower of 175 metres

View details